Technology Data Centers Solutions Case Studies About Blog Request a Quote
Adiabatic Precooling Technology

Maximize Data Center
Cooling Efficiency
Without Compromise

Peak+ manufactures adiabatic precooling systems for air-cooled chillers and dry coolers — delivering up to 30% compressor energy reduction and 6–15% PUE improvement for mission-critical data centers.

30%
Energy Reduction
6–15%
PUE Improvement
0
Humidity Added
12+
Enterprise Clients

Trusted by industry leaders

Microsoft
AWS
Iron Mountain
Vantage
QTS
Databank
Aligned
STACK
Flexential
CloudHQ
Sabey
H5
The Science

How Adiabatic Precooling Works

Peak+ adiabatic precooling system showing hot air entering and cool air exiting the condenser
🌡️
Entering Air Temperature
140°F → 104.5°F
01
Hot Ambient Air Enters
On peak summer days, ambient air temperatures can reach 140°F at the condenser inlet, forcing compressors to work at maximum capacity — or fail entirely.
02
Evaporative Precooling Activates
The Peak+ system uses controlled evaporation through a thin filter media to cool incoming air. Water is either evaporated or contained — no humidity is transferred indoors.
03
Cooled Air Crosses the Coil
Precooled air at ~104.5°F enters the condenser coil, reducing compressor head pressure and amp draw by up to 30%, dramatically improving efficiency and reliability.
04
Real-Time NOC Monitoring
Peak+ monitors every unit via our cloud-based Network Operations Center, delivering verified energy savings reports and optimizing performance 24/7.
Key Advantages

Built for Mission-Critical Performance

Every aspect of the Peak+ system is engineered to deliver measurable results in the most demanding data center environments.

Up to 30% Energy Savings
Reduce compressor energy consumption significantly during peak demand periods, directly lowering your utility bill and carbon footprint.
📊
6–15% PUE Reduction
Lower your Power Usage Effectiveness on design days, unlocking additional IT load capacity and increasing revenue potential for your facility.
🛡️
Zero Compressor Failures
Multiple clients have gone from losing 9+ compressors per year to zero failures after installing Peak+, dramatically reducing maintenance costs.
💧
No Indoor Humidity Transfer
Our patented filter media design ensures all water is evaporated or contained — never transferred to indoor air or condenser coils.
🔧
Magnetic Attachment
Attaches magnetically to existing HVAC units for rapid, non-invasive installation. Approved by major HVAC OEMs including Trane and others.
💰
Utility Rebates Available
Peak+ qualifies for rebates with most electric utilities. We've secured over $300,000 in rebates for a single client — covering up to 50% of project cost.
Solutions

New Design & Retrofit Solutions

Whether you're designing a new facility or optimizing an existing one, Peak+ delivers compelling value at every stage.

New Design

Optimize From the Ground Up

Integrate Peak+ into your new data center design to solve CFD challenges before they become operational problems, and maximize ROI from day one.

  • Solve failing external CFDs before construction
  • Increase revenue by lowering peak PUE
  • Control ambient air temperatures on design days
  • Capture utility rebates for demand reduction
Retrofit

Revitalize Existing Infrastructure

Extend the life of aging equipment, resolve reliability issues, and achieve significant energy savings without a full HVAC replacement.

  • Resolve HVAC reliability and tripping issues
  • Increase efficiency through lower PUE
  • Extend compressor and condenser coil life
  • Increase capacity of aging equipment
CFD Performance

Take Control of Entering Air Temperatures

Peak+ eliminates the risk of failing external CFDs by dramatically reducing condenser inlet temperatures on the hottest design days.

Before Peak+
140.0°F
Condenser inlet temperature on design day. Compressors at maximum stress, risk of failure.
After Peak+
104.5°F
Precooled air temperature entering condenser. Compressors operating efficiently with extended lifespan.
Global Reach

Peak+ Installations Worldwide

From hyperscale campuses to enterprise data centers, Peak+ is deployed across critical facilities worldwide.

Validated Results

Proven in Critical Facilities

DATA CENTER
0
Compressor Failures (vs. 9/year)
Private Data Center
A 3,310-ton air-cooled facility was losing compressors regularly during peak conditions. After Peak+ installation, zero compressor failures occurred, while overall HVAC energy consumption dropped 25% and PUE improved from 1.60 to 1.45.
📍 Southern California, USA
COMMERCIAL
$300K
Utility Rebate Secured
Riata Trace Commercial Complex
Peak+ delivered 978 kW of demand reduction — 98% of the forecasted savings — and secured a $300,000 utility rebate from Austin Energy, covering half the project cost for this 688,100 SF property.
📍 Austin, Texas
ENTERPRISE
$80K
Annual Operating Cost Reduction
Verizon Data Center
"Peak+ lowered one of our data center's annual operating cost by $80,000; it quickly paid for itself." The system delivered rapid ROI with zero operational disruption to this mission-critical facility.
📍 United States
Client Feedback

What Our Clients Say

Peak+ lowered one of our data center's annual operating cost by $80,000; it quickly paid for itself.

Phillip Shatter
Verizon

We selected Peak+ to help achieve our sustainability goals. Peak+ drastically cut our energy consumption by 40,000 kilowatt hours, and thus, our carbon footprint.

Mark D'Ambrosi
Summit Properties

We installed Peak+ to ensure our HVAC units remained on-line during hot summer days. This was an investment for our tenants to ensure all day, reliable comfort.

Kim Cart
LBA Realty
Get Started

Ready to Reduce Your Peak PUE?

Join 12+ leading data center operators who trust Peak+ to deliver measurable energy savings, improved reliability, and a lower carbon footprint.